KETI

ROii Optimal Tri-Star Topology

Loading GLPK...
Each Switch Has a Direct Link to ACU-IT — All Flows 2 Hops — Triangle Backbone for Failover Only
3D Shuttle Network Topology
Drag to rotate · Scroll to zoom · Right-click to pan
Home
Sensor Hardware Specifications
SensorModelInterfaceLink SpeedPayloadPeriodTx Time (1st hop)
Front Center LiDARAutoL G321000BASE-T11000 Mbps131072B (128KB)10ms (100Hz)1048.9 µs
Front Left LiDARHesai Pandar 40P1000BASE-T11000 Mbps32768B (32KB)10ms (100Hz)262.4 µs
Front Right LiDARHesai Pandar 40P1000BASE-T11000 Mbps32768B (32KB)10ms (100Hz)262.4 µs
Rear LiDARAutoL G321000BASE-T11000 Mbps131072B (128KB)10ms (100Hz)1048.9 µs
Front RadarContinental MRR-351000BASE-T11000 Mbps4096B (4KB)5ms (50Hz, ×2/cycle)33.1 µs
Front-Left CornerContinental MRR-351000BASE-T11000 Mbps4096B (4KB)5ms (50Hz, ×2/cycle)33.1 µs
Front-Right CornerContinental MRR-351000BASE-T11000 Mbps4096B (4KB)5ms (50Hz, ×2/cycle)33.1 µs
Rear-Left CornerContinental MRR-351000BASE-T11000 Mbps4096B (4KB)5ms (50Hz, ×2/cycle)33.1 µs
Rear-Right CornerContinental MRR-351000BASE-T11000 Mbps4096B (4KB)5ms (50Hz, ×2/cycle)33.1 µs
Network Topology — Tri-Star (3× ACU Links)
Per-Switch GCL — Gate Control by Egress Port
Per-Link GCL Timeline (Gantt)
Packet E2E Delay
Link Utilization
Packet Schedule Table
PacketFlowRouteReleaseEndE2EDeadlineSlackStatus
Customize Model (JSON)
Raw GCL Output (JSON)
-